Woodlot Operations

  • Posted on: 12 March 2023
  • By: CharlesLever

There is an active woodlot approximately 1 Km up the #506 - Geogrid trail. Signs have been posted at the entrance to the Geogrid trail, at the entrance to the woodlot road, and on the other side of that road to advise riders and ask that they reduce speed to avoid damaging the road surface.

Event: